3404 Industrial Drive - Bossier City, LA 71112

 

I. CALL TO ORDER – Tim Larkin, President.

II. OPENING PRAYER – Mike Montgomery – Commissioner.

III. PLEDGE OF ALLEGIANCE – Tim Larkin, President.

IV. ROLL CALL – Deanna Rabb, Secretary.

V. READING OF MINUTES – Deanna Rabb, Secretary.

VI. REQUESTS BY VISITORS

A. Christopher E. Myers, P.E. with Coyle Engineering Co, Inc. on behalf of their client, Willow Chute Ranch Subdivision, LLC are requesting a permit to grant approvals for an encroachment for a 26’ wide roadway crossing Willow Chute Bayou, installation of a 24” diameter outfall pipe from the storm water detention pond, three roadside ditches to discharge into the bayou, and the clearing of some trees and underbrush all within the Levee District’s 100’ Control Area of Willow Chute Bayou. (PERMIT #2022 – 58)

B. Ben Rauschenbach, P.E., Bossier City Engineer with Manchac Consulting Group is requesting a proposed 20’ access servitude to improve the Carriage Oaks No. 2 Lift Station by constructing a 10’ concrete access apron from Hickory Ridge Drive to the existing lift station located at Lot 27 of Carriage Oaks East. (PERMIT #2022 - 61)

VII. OLD BUSINESS

A. Discussion to continue regarding Red Chute Levee Surfacing project.

B. Continued discussion of the proposed Red River Scour Repair project.

VIII. NEW BUSINESS

A. Review of submitted plats received from the MPC for approval and authorization of No Objection Letters from the Bossier Levee District: 1). Lot No. 1 And Lot No. 2 Amended Plat of Tract No. 6B of Lucky Partition, Unit No. 2A near Bull Fight Bayou.

B. Mark Long to discuss Crowing Lane concrete culvert headwall.

C. To adopt the CURRENT millage rate @ 4.17 mills for the 2022 year and the passage of the resolution – NO ROLL FORWARD. (Tax roll: $770,019,504 estimated to produce
approximately $3,205,018 in tax revenue) (FYI: 2021 tax roll was: $709,320,693, estimated to produce approximately $2,957,881 in tax revenue.)

D. Resolution for the Engagement Letter, Investment Confirmation Letter, Legal Letter, Bank Confirmation, and the Louisiana Compliance Questionaire be signed by President Tim Larkin, and then subsequent letters mailed to Huddleston Smith (Attn: Mr. Brad Smith), Blanchard, Walker, O’Quin and Roberts (Attn: Mr. Tom Arceneaux) and returned completed to Broussard and Company (Attn: Mr. Mike DeFalco) as adopted for the 2021 - 2022 fiscal year audit.

XI. LEVEE AND DRAINAGE REPORT

X. APPROVAL OF EXPENDITURES

XI. ADJOURNMENT

 

In accordance with the Americans with Disabilities Act, if you need special assistance, please contact Deanna Rabb, at (318) 746-7151 describing the assistance that is needed.

Search BLD Website

Address & Phone

Bossier Levee District
3404 Industrial Drive
Bossier City, LA 71112

P.O. Box 8279
Bossier City, LA 71113

p: (318) 746-7151
f: (318) 746-7206

After Hours/Emergency
Contact: (318) 455-3696

Bossier Levee District - 3404 Industrial Drive - Bossier City, LA 71112

P.O. Box 8279 - Bossier City, LA 71113

(318) 746-7151

 

Website managed by White Roof Interactive